Dormant Dragging

With another wet front approaching and expected to drop around a inch of rain we decided to go ahead and drag the fairways and intermediate cuts. Once the fairway is dragged it was blown off by a tractor blower and a 1445 blower. We were hoping to remove as much loose matter as possible so if heavy rain did fall we wouldn't get loose debris streaks that usually occur after heavy rain. The process also gave the zoysia fairways a more rejuvenated look to the eyes. This process took 4 hours to complete.

Popular Posts